HULDRA SILVER PROVIDES ADDITIONAL DRILL RESULTS FROM THE 2011 EXPLORATION PROGRAM AT TREASURE MOUNTAIN THAT INCLUDES 7,013 GRAMS PER TONNE Ag OVER 1.37 METRES IN HOLE TM11-26
Vancouver, British Columbia – November 23, 2011 – Huldra Silver Inc. (TSX-V:HDA) (the “Company” or “Huldra”) today is pleased to provide additional results from the 2011 exploration program at Treasure Mountain. The results of additional assays from the first four holes received included 7,013 grams per tonne Ag, 21.82% Pb, 19.63% Zn and 4.9% Mn over 1.37 metres in hole TM11-26 that intersected the vein structure approximately 10 metres above the Level 2 Drift. Additional results were disclosed in the Company’s press release dated November 18, 2011.
The following is a summary of drill results (lengths are not considered true width):

51 diamond drill holes were drilled over a total length of 5,073 metres on the main mine development, with the objective of further defining resources on the upper 150 metres of the mine.
A location map of the drill holes can be viewed on the Company website at www.huldrasilver.com
Laboratory Procedures and Quality Assurance
Drill core is logged by a geologist and cut at predetermined intervals using a diamond saw. One half of the sample is archived onsite and the other half is trucked to Acme Analytical Laboratories Ltd’s facility in Vancouver, BC, where the sample is crushed, split and pulverized to -200 mesh. A 0.5 gram portion of the pulp is then digested in hot aqua regia and analyzed for 31 elements by ICP MS method. Over limits for Ag is by fire assay with gravimetric finish, and for Pb, Zn and Mn by multi-acid digestion and ICP ES finish.
Certified standard reference material (“SRM”), including core duplicates and blanks, have been inserted into each sample shipment at a frequency of approximately one SRM per ten samples.
Technical information in this news release has been reviewed and approved by Jim Cuttle, P. Geo, a Qualified Person as defined by NI 43-101. Details of the Company’s Treasure Mountain property can be found in its NI 43-101 technical report entitled “Technical Report, Project Update, Treasure Mountain Property, Tulameen River Area, B.C. Canada” dated effective June 15, 2011, which is available on SEDAR at www.sedar.com.
About Huldra
Huldra is currently working on plans to put its Treasure Mountain Project, located 3 hours east of Vancouver, BC, into development, subject to permitting and financing utilizing an offsite mill being constructed at the Company’s property outside of Merritt, BC. The Company is also actively assessing other opportunities for acquisition and development.
On behalf of the Board of Directors
“Ryan Sharp”
Ryan Sharp, MBA
President, CEO & Director
For additional information contact:
Ryan Sharp at 604-647-0142
ryan@huldrasilver.com
IR@huldrasilver.com


